- Mooring Analysis
- Mooring Design Criteria
- Consequences of Failure
- Indicative GOM hurricane extreme metocean conditions
- Site-specific risk assessment and mitigation
- Mooring hardware issues such as anchor system considerations and mooring system improvements
- Mooring operation issues such as deployment, hurricane preparedness, and inspection
This RP was developed through a cooperative arrangement with the American Petroleum Institute’s Subcommittee on Offshore Structures – RP 2SK Task Group, the API Executive Committee on Drilling and Production Operations, and the Joint Industry Project entitled “US Gulf of Mexico Mooring Strength Reliability” (MODU JIP).